The West-End Public Bath
| Location | : | Oslo, Norway |
| Building type | : | Public bath, refurbishment |
| Client | : | City of Oslo, department of Parks and Leisure |
| Size | : | 400m² |
| Schedule | : | Finished 2000 |
| Consultants | : | B-Consult as, Opak as |
| Primary architects | : | Einar Jarmund, Håkon Vigsnæs, Alessandra Kosberg |
|
The main challenge of this refurbishment of a 1930s public Bath was to turn a single-sex wardrobe situation to a new two-sex solution inside the same spatial limits. |
||